
Basement · Newtown, PA
Basement with a library wall and a bar.
A finished basement in Newtown: a family room with built-in bookcases and a rolling ladder, a pool table, a bar with glass shelves, a home gym and a full bathroom.
- Design-Build Remodeling
- A Crew We Manage
- General liability insurance (biBERK)
- 1-Year Written Warranty
- Written Change Orders
- NJ HIC #13VH13547600
- PA HIC #PA199109
The room
What’s in this basement.
White Shaker cabinets and wide cased openings, crown and a cased beam across the ceiling, recessed lights throughout, and a light oak-look plank floor that runs through every room.
The library wall is built-in bookcases painted dark inside, with a TV in the center over a run of drawers, and an oak ladder that rolls along a black rail across the top.
The bar has a gray island with seats for four, glass shelves on chrome posts in front of a mirror, a stainless refrigerator and a tall rack of diagonal wine cubbies, under two drum pendants.
Down an arched hallway are a home gym, with a mirror wall, a ballet barre and a long blue bench with cubbies, and a bathroom with a black Shaker vanity, a round mirror between black sconces, a marble mosaic floor and a glass shower in dark and white tile.


- Room
- Basement
- Town
- Newtown, PA
- Bar
- Seats four
- Also
- Gym and full bath
This basement at our pricing today
$176,528.07
Figured at our rates per square foot, on the size the photos show. It isn’t the price this client signed.
Up close
The details, one at a time.

The ladder
An oak library ladder on a black rail, rolled to the end of the bookcases.

Bar to game room
The gray bar island and its four stools, open to the pool table.

Pocket doors
A pair of white pocket doors with an overlay of interlocking circles, in a wide cased opening.

The arched hall
Three plaster arches in a row, with tall baseboards, leading to a lit display shelf.

The gym
A mirror wall, a ballet barre and a long blue bench with open cubbies under a cushion.

The bathroom
A black Shaker vanity with chrome pulls, a glass shower and a marble mosaic floor.
How it works
Four steps, the same for every room.
Your price and scope are in writing before any work starts. The full process.
- 01
Discovery call
A call about the room and your budget, then a visit at the house. We measure, open what we can, and look at what the house is hiding: framing, plumbing, the electrical panel.
- 02
Scope and design
After the visit you get a written scope: what we do and don’t do, materials, allowances and the price. Layout and selections are settled on paper before anything comes out.
- 03
Construction
Any permit the work needs, in place before that work starts. Any change is a written change order you sign before that work starts. Each week we work there, you get a Monday email with the week ahead and a Friday recap with photos.
- 04
Final walk-through
We walk every room we touched with you and finish the punch list. Your 1-year workmanship warranty is in the contract, and manufacturer warranties pass through to you.
In writing
What we commit to, on every job.
The same words as our commitments page.
Written scope after our visit
After our visit, you get the scope in writing: what we’re doing, what we’re not, the materials and allowances, and the price. If it isn’t in the scope, it isn’t in the job, so nobody ends up arguing about what was “obviously included.”
A crew we manage
A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. We manage those subcontractors and stand behind their work. You deal with us, start to finish.
General liability insurance
General liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK). Certificate available on request. We’re a registered home improvement contractor in New Jersey, NJ HIC #13VH13547600, and Pennsylvania, PA HIC #PA199109. On your job, any permit the work needs is in place before that work starts.
1-year workmanship warranty
Your contract includes a 1-year workmanship warranty on our installation. Manufacturer warranties on fixtures, appliances and materials pass through to you on top of that. The full warranty terms, including what it doesn’t cover, come with your contract, before you sign.
You hear it from us first
Your contract has a schedule and we run the job against it. If something puts a date at risk, you hear it from us as soon as we know, not when you notice.
Written change orders
From the day you sign, nothing is added to your bill without your written approval. If you change something, or we open a wall and find a problem, you get a written change order with the price before that work starts.
More photos
More of the finished basement, from other angles.
Tap a photo to see it full size.



