Princeton · NJ · Since 2018
2 Week Bathroom
Princeton, NJ
A New Bathroom in 14 Days.
Our Commitment
A new bathroomin fourteen days.Not a renovation. A result.
The Home X delivers a complete bathroom renovation in 14 calendar days. One in-house crew handles tile, plumbing, and electrical in coordinated sequence with no gaps between trades. Schluter KERDI waterproofing is applied before a single tile is set, regardless of timeline. From demolition on day one to final walkthrough on day 14, nothing is subcontracted and nothing is skipped.
Scope of Work
What We
Deliver
Investment
Request Pricing
Timeline
14 Days
Demolition and Waterproofing
Full demolition completed on day one. Schluter KERDI membrane applied and cured on day two. No tile is set until waterproofing is complete and inspected. This is non-negotiable, even at pace.
Tile Installation
Floor tile and wall tile set in the first week by our trade-certified tile setters. Floor first, walls second, wet areas last. Grout sealed before week one ends.
Vanity and Plumbing Trim-Out
Vanity installed and all plumbing trim-out completed in week two: supply lines, drain connections, faucet, and shut-off valves. No visible supply lines, no exposed connections.
Shower Glass or Tub Surround
Frameless shower glass is measured on day one and templated for fabrication during tile week. Installation is scheduled for days ten to twelve, coordinated with plumbing trim-out.
Electrical and Lighting
Vanity lighting, exhaust fan, and recessed wet-location fixtures installed and wired in week two by our licensed electricians. All work is permitted and inspected.
Final Finishes and Handover
Mirrors, accessories, caulk, and touch-up completed on day 13. Full punch list addressed and handover on day 14.
Recent Work
Bathroom Renovation Projects
Why The Home X
Not all contractorsare equal.
| The Home X | Big Box | Typical Contractor | |
|---|---|---|---|
| In-house trades — no strangers on site | |||
| Written scope delivered in 24 hours | |||
| Transparent, itemised pricing | |||
| Licensed in New Jersey & Pennsylvania | |||
| Historic home & district expertise | |||
| Workmanship warranty (5–lifetime yrs) | |||
| Weekly written client updates | |||
| 3D design rendering included | |||
| Princeton-area specialists |
Written scope within 24 hours · No obligation
Why The Home X
One team. One standard.
Every time.
Every Trade Is In-House
Tile, plumbing, and electrical on separate schedules is why bathroom renovations take six weeks. Our team handles all three in coordinated sequence with no gaps between trades and no rescheduling delays.
Pre-Ordered Before Day One
Every tile, fixture, vanity, and fitting is on order before demolition begins. The 14-day timeline depends on nothing arriving late. We confirm all deliveries before setting a start date.
Schluter Waterproofing, Always
Our waterproofing standard does not change because the timeline is compressed. Schluter KERDI membrane is applied and cured before tile installation on every 2 Week Bathroom, without exception.
Defined Scope, No Scope Creep
The 2 Week Bathroom is a defined programme with a defined result. You know exactly what you are getting before day one begins. Changes after the design lock affect the timeline.
Credentials
Awards & Recognition
Category Winner
2024 Best Kitchen Renovation
Princeton Home Awards
127+ Reviews
5.0 Star Average
Google Reviews
Licensed NJ & PA
Fully Insured & Bonded
State Certification
Lifetime Warranty
Workmanship Guarantee
Every project, every trade
Historic Experts
Princeton District Guidelines
Period-appropriate finishes
24hr Scope
Written Scope Delivered
No vague estimates, ever
In-House Trades
One Team, One Standard
No unknown subcontractors
Our Process
From first call to
final walk-through.
Site Visit and Scope Confirmation
1-2 hrsWe visit your bathroom, assess existing conditions, and confirm it qualifies for the 2 Week programme. Suitability depends on bathroom size, existing layout, and condition of current plumbing and electrical.
Material Selection and Design Lock
3-5 daysAll tile, vanity, fixtures, lighting, and accessories selected from our curated 2 Week palette. Everything locked before procurement begins. No changes after this stage.
Procurement and Delivery Confirmation
1-2 weeksEvery material ordered and delivery date confirmed before a start date is set. The 14-day clock begins only when everything is ready to arrive on time.
Days 1 to 2: Demolition and Waterproofing
Days 1-2Full demolition on day one. Schluter KERDI membrane applied and fully cured on day two. No tile begins until waterproofing is complete.
Days 3 to 10: Tile, Vanity, and Rough Trim
Days 3-10Floor tile, wall tile, vanity installation, shower glass templating and fabrication, and plumbing rough trim completed in sequence.
Days 11 to 14: Fixtures, Electrical, and Handover
Days 11-14Plumbing trim-out, electrical fixtures, shower glass installation, mirrors, and accessories. Punch list and handover on day 14.
Service Area
2 Week Bathroom Throughout Mercer County, NJ
The Home X serves Princeton and all surrounding Mercer County communities for 2 week bathroom. Travel fees may apply for projects beyond a 25-mile radius of Princeton, NJ 08542.
Common Questions
2 Week Bathroom
— answered honestly.
Straight answers to the questions Princeton homeowners ask most about 2 week bathroom.
Client Story
“The Home X transformed our1920s Princeton colonial intothe home we always dreamed of.On time, on budget — and thecraftsmanship exceeded everysingle expectation.”
Ready to get started?
Let's talk today.
Response guaranteed within 24 hours · Licensed NJ & PA


