Skip to content
Primary bathroom in New Hope, PA: a paneled drop-in tub with a marble deck and brass filler, a glass shower behind a beadboard half wall, and a greige vanity with brass faucet and gilt mirror on a marble hex floor

Bathroom · New Hope, PA

Paneled tub under the window.

A primary bath in New Hope under a sloped ceiling, with a paneled tub below the window, a glass shower behind a paneled half wall and a greige vanity with brass fixtures.

See every photo
  • Design-Build Remodeling
  • A Crew We Manage
  • General liability insurance (biBERK)
  • 1-Year Written Warranty
  • Written Change Orders
  • NJ HIC #13VH13547600
  • PA HIC #PA199109

The room

What’s inthis bathroom.

A greige painted vanity, painted wood paneling around the tub, patterned wallpaper, a marble hex floor, white hex mosaic in the shower and brushed brass fixtures.

The tub is built into a paneled surround with a marble deck and a wall-mounted brass filler.

The shower is behind a paneled half wall with glass above. The vanity has a pull-out with a makeup seat.

Drop-in tub in a white paneled surround with a marble deck and a wall-mount brass filler, under a window with café curtains and beadboard walls
Frameless glass shower with brass hinges behind a beadboard half wall capped in marble, with blush subway tile and brushed brass trim
Room
Primary bathroom
Town
New Hope, PA
Tub
Paneled drop-in, marble deck
Shower
Glass, behind a half wall

This bathroom at our pricing today

$42,178.83

Figured from what the photos show, on the Primary tier of our instant estimate. It isn’t the price this client signed. Your price comes in a written scope after we see your house.

Price your bathroom →

The selections

What went into it,from the photos.

Each sample is cut from the finished photos, and the color under it is taken from the same spot.

  • Vanity: Greige paint, cut from the finished photo
    VanityGreige paint#BDB7B0 in the photo
  • Accent wall: Patterned wallpaper, cut from the finished photo
    Accent wallPatterned wallpaper#8D8277 in the photo
  • Tub surround: Painted wood paneling, cut from the finished photo
    Tub surroundPainted wood paneling#CFC4BA in the photo
  • Floor: Marble hex tile, cut from the finished photo
    FloorMarble hex tile#CAC4C1 in the photo
  • Shower walls: White hex mosaic, cut from the finished photo
    Shower wallsWhite hex mosaic#E0DEDA in the photo
  • Tub filler and faucets: Brushed brass, cut from the finished photo
    Tub filler and faucetsBrushed brass#BCA076 in the photo

The colors in this bathroom, as photographed

Concepts

The same room,in other colors.

This is the finished photo with the vanity in other colors. The light, the shadows and every other finish stay as photographed. Only that one surface changes.

This bathroom as builtAs built

This is the bathroom as we built it. Pick a color to see the vanity changed in the same photo.

Mood boards

The finishes together,as built and as concepts.

The first board is this bathroom as built: the photo, the samples cut from it and the colors measured from it. The others are the concepts above, laid out the same way.

Every sample on this board is cut from the finished photos, and each color chip is measured from the same photos. Tap the board to see it full size.

Up close

The details,one at a time.

Drop-in tub in a white paneled surround with a marble deck and a wall-mount brass filler, under a window with café curtains and beadboard walls

Tub at the window

A paneled tub with a marble deck under the window.

Brushed brass rain head, handheld on a slide bar and valve on glossy subway tile behind frameless glass with a brass pull

Shower trim

A brass valve and handheld in the shower.

Narrow pull-out cabinet open beside the vanity next to a lowered counter and a brass-framed seat by the window

Vanity pull-out

A pull-out cabinet in the vanity next to a seat.

Brass widespread faucet on a quartz top under a gilt mirror with brass and white sconces on small-pattern wallpaper

Mirror and sconces

A gilt mirror with a brass sconce on each side.

How it works

Four steps,the same for every room.

Your price and scope are in writing before any work starts. The full process.

  1. 01

    Discovery call

    A call about the room and your budget, then a visit at the house. We measure, open what we can, and look at what the house is hiding: framing, plumbing, the electrical panel.

  2. 02

    Scope and design

    After the visit you get a written scope: what we do and don’t do, materials, allowances and the price. Layout and selections are settled on paper before anything comes out.

  3. 03

    Construction

    Any permit the work needs, in place before that work starts. A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. Any change is a written change order you sign before that work starts.

  4. 04

    Final walk-through

    We walk every room we touched with you and finish the punch list. Your 1-year workmanship warranty is in the contract, and manufacturer warranties pass through to you.

In writing

What we commit to,on every job.

The same words as our commitments page.

  1. Written scope after our visit

    After our visit, you get the scope in writing: what we’re doing, what we’re not, the materials and allowances, and the price. If it isn’t in the scope, it isn’t in the job, so nobody ends up arguing about what was “obviously included.”

  2. A crew we manage

    A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. We manage those subcontractors and stand behind their work. You deal with us, start to finish.

  3. General liability insurance

    General liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK). Certificate available on request. We’re a registered home improvement contractor in New Jersey, NJ HIC #13VH13547600, and Pennsylvania, PA HIC #PA199109. On your job, any permit the work needs is in place before that work starts.

  4. 1-year workmanship warranty

    Your contract includes a 1-year workmanship warranty on our installation. Manufacturer warranties on fixtures, appliances and materials pass through to you on top of that. The full warranty terms, including what it doesn’t cover, come with your contract, before you sign.

  5. You hear it from us first

    Your contract has a schedule and we run the job against it. If something puts a date at risk, you hear it from us as soon as we know, not when you notice.

  6. Written change orders

    From the day you sign, nothing is added to your bill without your written approval. If you change something, or we open a wall and find a problem, you get a written change order with the price before that work starts.

Every photo

The finished bathroom,every angle.

Tap a photo to see it full size.

Yours next

Talk to Ryanabout your bathroom.

Start with a call: the room, what you want changed and what you want to spend. Then Ryan comes out to the house, and you get a written scope after the visit.

Or call or text (609) 874-0990

Next project

Bathroom in Washington Crossing, PA: cream inset vanity with brass pulls and a quartz top, a brushed brass faucet, an arched brass mirror and two brass sconces with linen shades

Cream vanity, brass fixtures.

Bathroom · Washington Crossing, PA