Skip to content
Primary bathroom in Princeton, NJ: white double vanity with a quartz top, brass faucets, arched mirrors, brass sconces with linen shades and blue botanical wallpaper over a marble hex floor

Bathroom · Princeton, NJ

Blue wallpaper and brass.

A primary bath in Princeton with blue botanical wallpaper, a white double vanity under arched mirrors and brass sconces, a marble hex floor, a glass shower and a freestanding tub.

See every photo
  • Design-Build Remodeling
  • A Crew We Manage
  • General liability insurance (biBERK)
  • 1-Year Written Warranty
  • Written Change Orders
  • NJ HIC #13VH13547600
  • PA HIC #PA199109

The room

What’s inthis bathroom.

Blue botanical wallpaper, a white painted vanity, a white marble top, brushed brass faucets and shower trim, white subway tile in the shower and a marble hex mosaic floor.

The vanity has two sinks, each with its own arched mirror and a pair of sconces.

The shower has a rain head and a handheld on a slide bar, both in brass. A linen tower stands between the shower and the tub.

White linen tower with brass pulls between a frameless glass shower with long white tile and a freestanding tub, on a marble hex floor
Brushed brass rain head, handheld on a slide bar and valve trim on long white tile, behind frameless glass with a brass pull
Room
Primary bathroom
Town
Princeton, NJ
Vanity
Double, with a drawer bank
Bathing
Glass shower and freestanding tub

This bathroom at our pricing today

$45,299.52

Figured from what the photos show, on the Primary tier of our instant estimate. It isn’t the price this client signed. Your price comes in a written scope after we see your house.

Price your bathroom →

The selections

What went into it,from the photos.

Each sample is cut from the finished photos, and the color under it is taken from the same spot.

  • Walls: Blue botanical wallpaper, cut from the finished photo
    WallsBlue botanical wallpaper#D3D4D5 in the photo
  • Vanity: White paint, cut from the finished photo
    VanityWhite paint#DDDEDE in the photo
  • Vanity top: White marble, cut from the finished photo
    Vanity topWhite marble#C5C4C2 in the photo
  • Faucets and shower trim: Brushed brass, cut from the finished photo
    Faucets and shower trimBrushed brass#A19066 in the photo
  • Shower walls: White subway tile, cut from the finished photo
    Shower wallsWhite subway tile#C8C9C7 in the photo
  • Floor: Marble hex mosaic, cut from the finished photo
    FloorMarble hex mosaic#C4C7CB in the photo

The colors in this bathroom, as photographed

Mood boards

The finishes together,as built.

This bathroom as built: the photo, the samples cut from it and the colors measured from it.

Every sample on this board is cut from the finished photos, and each color chip is measured from the same photos. Tap the board to see it full size.

Up close

The details,one at a time.

Brass widespread faucet on a quartz vanity under an arched mirror and two brass sconces

Faucet and mirror

A brass faucet under an arched mirror and a brass sconce.

Brushed brass rain head, handheld on a slide bar and valve trim on long white tile, behind frameless glass with a brass pull

Shower trim

A brass rain head and a handheld on a slide bar.

White linen tower with brass pulls between a frameless glass shower with long white tile and a freestanding tub, on a marble hex floor

Linen tower

A tall linen cabinet between the shower and the tub.

How it works

Four steps,the same for every room.

Your price and scope are in writing before any work starts. The full process.

  1. 01

    Discovery call

    A call about the room and your budget, then a visit at the house. We measure, open what we can, and look at what the house is hiding: framing, plumbing, the electrical panel.

  2. 02

    Scope and design

    After the visit you get a written scope: what we do and don’t do, materials, allowances and the price. Layout and selections are settled on paper before anything comes out.

  3. 03

    Construction

    Any permit the work needs, in place before that work starts. A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. Any change is a written change order you sign before that work starts.

  4. 04

    Final walk-through

    We walk every room we touched with you and finish the punch list. Your 1-year workmanship warranty is in the contract, and manufacturer warranties pass through to you.

In writing

What we commit to,on every job.

The same words as our commitments page.

  1. Written scope after our visit

    After our visit, you get the scope in writing: what we’re doing, what we’re not, the materials and allowances, and the price. If it isn’t in the scope, it isn’t in the job, so nobody ends up arguing about what was “obviously included.”

  2. A crew we manage

    A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. We manage those subcontractors and stand behind their work. You deal with us, start to finish.

  3. General liability insurance

    General liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK). Certificate available on request. We’re a registered home improvement contractor in New Jersey, NJ HIC #13VH13547600, and Pennsylvania, PA HIC #PA199109. On your job, any permit the work needs is in place before that work starts.

  4. 1-year workmanship warranty

    Your contract includes a 1-year workmanship warranty on our installation. Manufacturer warranties on fixtures, appliances and materials pass through to you on top of that. The full warranty terms, including what it doesn’t cover, come with your contract, before you sign.

  5. You hear it from us first

    Your contract has a schedule and we run the job against it. If something puts a date at risk, you hear it from us as soon as we know, not when you notice.

  6. Written change orders

    From the day you sign, nothing is added to your bill without your written approval. If you change something, or we open a wall and find a problem, you get a written change order with the price before that work starts.

Every photo

The finished bathroom,every angle.

Tap a photo to see it full size.

Yours next

Talk to Ryanabout your bathroom.

Start with a call: the room, what you want changed and what you want to spend. Then Ryan comes out to the house, and you get a written scope after the visit.

Or call or text (609) 874-0990

Next project

Primary bathroom in Princeton, NJ: long white double vanity with polished nickel faucets and glass bell sconces, a frameless glass shower with white herringbone tile and a marble hex floor

White bath with herringbone tile.

Bathroom · Princeton, NJ