
Bathroom · Princeton, NJ
White bath with herringbone tile.
A white primary bath in Princeton with herringbone tile in a large glass shower with a bench, a marble hex floor, a freestanding tub under the window and a long double vanity.
- Design-Build Remodeling
- A Crew We Manage
- General liability insurance (biBERK)
- 1-Year Written Warranty
- Written Change Orders
- NJ HIC #13VH13547600
- PA HIC #PA199109
The room
What’s inthis bathroom.
A white painted vanity, a white stone top, white herringbone tile in the shower, a white and gray marble hex floor, polished nickel faucets and a white freestanding tub.
The shower has a built-in bench and a niche, with a rain head and a handheld.
The tub sits under the window with a floor-mounted filler. The vanity has two sinks with an arched mirror and sconces over each.


- Room
- Primary bathroom
- Town
- Princeton, NJ
- Shower
- Walk-in, glass, with a bench
- Tub
- Freestanding, floor-mount filler
This bathroom at our pricing today
$46,339.74
Figured from what the photos show, on the Primary tier of our instant estimate. It isn’t the price this client signed. Your price comes in a written scope after we see your house.
Price your bathroom →The selections
What went into it,from the photos.
Each sample is cut from the finished photos, and the color under it is taken from the same spot.

VanityWhite paint#F1EFF2 in the photo 
Vanity topWhite stone#EFEEF1 in the photo 
Shower wallsWhite herringbone tile#E9EEEE in the photo 
FloorWhite and gray marble hex#D7D7DA in the photo 
FaucetsPolished nickel#D2CECB in the photo 
TubWhite freestanding tub#CECECC in the photo
The colors in this bathroom, as photographed
Mood boards
The finishes together,as built.
This bathroom as built: the photo, the samples cut from it and the colors measured from it.
Every sample on this board is cut from the finished photos, and each color chip is measured from the same photos. Tap the board to see it full size.
Up close
The details,one at a time.

Shower bench
A built-in bench in the herringbone shower.

Tub
A freestanding tub under the window with a floor-mounted filler.

Vanity drawers
A stack of drawers in the double vanity.

Mirrors and sconces
An arched mirror with a sconce on each side, over each sink.
How it works
Four steps,the same for every room.
Your price and scope are in writing before any work starts. The full process.
- 01
Discovery call
A call about the room and your budget, then a visit at the house. We measure, open what we can, and look at what the house is hiding: framing, plumbing, the electrical panel.
- 02
Scope and design
After the visit you get a written scope: what we do and don’t do, materials, allowances and the price. Layout and selections are settled on paper before anything comes out.
- 03
Construction
Any permit the work needs, in place before that work starts. A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. Any change is a written change order you sign before that work starts.
- 04
Final walk-through
We walk every room we touched with you and finish the punch list. Your 1-year workmanship warranty is in the contract, and manufacturer warranties pass through to you.
In writing
What we commit to,on every job.
The same words as our commitments page.
Written scope after our visit
After our visit, you get the scope in writing: what we’re doing, what we’re not, the materials and allowances, and the price. If it isn’t in the scope, it isn’t in the job, so nobody ends up arguing about what was “obviously included.”
A crew we manage
A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. We manage those subcontractors and stand behind their work. You deal with us, start to finish.
General liability insurance
General liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK). Certificate available on request. We’re a registered home improvement contractor in New Jersey, NJ HIC #13VH13547600, and Pennsylvania, PA HIC #PA199109. On your job, any permit the work needs is in place before that work starts.
1-year workmanship warranty
Your contract includes a 1-year workmanship warranty on our installation. Manufacturer warranties on fixtures, appliances and materials pass through to you on top of that. The full warranty terms, including what it doesn’t cover, come with your contract, before you sign.
You hear it from us first
Your contract has a schedule and we run the job against it. If something puts a date at risk, you hear it from us as soon as we know, not when you notice.
Written change orders
From the day you sign, nothing is added to your bill without your written approval. If you change something, or we open a wall and find a problem, you get a written change order with the price before that work starts.
Every photo
The finished bathroom,every angle.
Tap a photo to see it full size.
More bathrooms we’ve built
Yours next
Talk to Ryanabout your bathroom.
Start with a call: the room, what you want changed and what you want to spend. Then Ryan comes out to the house, and you get a written scope after the visit.
Or call or text (609) 874-0990
Next project

Double vanity with a makeup desk.
Bathroom · Princeton, NJ


