Skip to content
Bathroom in Washington Crossing, PA: cream inset vanity with brass pulls and a quartz top, a brushed brass faucet, an arched brass mirror and two brass sconces with linen shades

Bathroom · Washington Crossing, PA

Cream vanity, brass fixtures.

A family bath in Washington Crossing with a cream inset vanity under an arched brass mirror, a tub and shower in white subway tile with brass trim and a tall linen cabinet.

See every photo
  • Design-Build Remodeling
  • A Crew We Manage
  • General liability insurance (biBERK)
  • 1-Year Written Warranty
  • Written Change Orders
  • NJ HIC #13VH13547600
  • PA HIC #PA199109

The room

What’s inthis bathroom.

A cream painted vanity, a white quartz top, brushed brass faucet, mirror and tub trim, white subway tile and a white tile floor.

The vanity has a single sink with drawers and doors, and brass pulls.

The tub and shower are tiled in white subway tile with a niche, a brass valve, spout and shower head.

Cream vanity with a brass faucet and arched mirror beside a tub-shower in white subway tile with brushed brass trim
Tub-shower in white subway tile with brushed brass trim and a niche, beside a tall white linen cabinet
Room
Bathroom
Town
Washington Crossing, PA
Bathing
Tub and shower
Finish
Brushed brass throughout

This bathroom at our pricing today

$25,913.53

Figured from what the photos show, on the Guest tier of our instant estimate. It isn’t the price this client signed. Your price comes in a written scope after we see your house.

Price your bathroom →

The selections

What went into it,from the photos.

Each sample is cut from the finished photos, and the color under it is taken from the same spot.

  • Vanity: Cream paint, cut from the finished photo
    VanityCream paint#DBD0C5 in the photo
  • Vanity top: White quartz, cut from the finished photo
    Vanity topWhite quartz#E8E0D5 in the photo
  • Faucet and tub trim: Brushed brass, cut from the finished photo
    Faucet and tub trimBrushed brass#9B7A47 in the photo
  • Tub surround: White subway tile, cut from the finished photo
    Tub surroundWhite subway tile#F4F1F0 in the photo
  • Tub valve: Brass trim, cut from the finished photo
    Tub valveBrass trim#A47F49 in the photo
  • Floor: White tile, cut from the finished photo
    FloorWhite tile#EFEFF1 in the photo

The colors in this bathroom, as photographed

Concepts

The same room,in other colors.

This is the finished photo with the vanity in other colors. The light, the shadows and every other finish stay as photographed. Only that one surface changes.

This bathroom as builtAs built

This is the bathroom as we built it. Pick a color to see the vanity changed in the same photo.

Mood boards

The finishes together,as built and as concepts.

The first board is this bathroom as built: the photo, the samples cut from it and the colors measured from it. The others are the concepts above, laid out the same way.

Every sample on this board is cut from the finished photos, and each color chip is measured from the same photos. Tap the board to see it full size.

Up close

The details,one at a time.

Brushed brass cross-handle valve and wall spout on white subway tile with a recessed niche

Tub trim

A brass valve and spout in the subway tile.

Brushed brass widespread faucet with cross handles on a quartz top, with a brass sconce and paper holder

Faucet

A brass faucet on a white quartz top.

Tub-shower in white subway tile with brushed brass trim and a niche, beside a tall white linen cabinet

Linen cabinet

A tall linen cabinet next to the tub.

How it works

Four steps,the same for every room.

Your price and scope are in writing before any work starts. The full process.

  1. 01

    Discovery call

    A call about the room and your budget, then a visit at the house. We measure, open what we can, and look at what the house is hiding: framing, plumbing, the electrical panel.

  2. 02

    Scope and design

    After the visit you get a written scope: what we do and don’t do, materials, allowances and the price. Layout and selections are settled on paper before anything comes out.

  3. 03

    Construction

    Any permit the work needs, in place before that work starts. A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. Any change is a written change order you sign before that work starts.

  4. 04

    Final walk-through

    We walk every room we touched with you and finish the punch list. Your 1-year workmanship warranty is in the contract, and manufacturer warranties pass through to you.

In writing

What we commit to,on every job.

The same words as our commitments page.

  1. Written scope after our visit

    After our visit, you get the scope in writing: what we’re doing, what we’re not, the materials and allowances, and the price. If it isn’t in the scope, it isn’t in the job, so nobody ends up arguing about what was “obviously included.”

  2. A crew we manage

    A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. We manage those subcontractors and stand behind their work. You deal with us, start to finish.

  3. General liability insurance

    General liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK). Certificate available on request. We’re a registered home improvement contractor in New Jersey, NJ HIC #13VH13547600, and Pennsylvania, PA HIC #PA199109. On your job, any permit the work needs is in place before that work starts.

  4. 1-year workmanship warranty

    Your contract includes a 1-year workmanship warranty on our installation. Manufacturer warranties on fixtures, appliances and materials pass through to you on top of that. The full warranty terms, including what it doesn’t cover, come with your contract, before you sign.

  5. You hear it from us first

    Your contract has a schedule and we run the job against it. If something puts a date at risk, you hear it from us as soon as we know, not when you notice.

  6. Written change orders

    From the day you sign, nothing is added to your bill without your written approval. If you change something, or we open a wall and find a problem, you get a written change order with the price before that work starts.

Every photo

The finished bathroom,every angle.

Tap a photo to see it full size.

Yours next

Talk to Ryanabout your bathroom.

Start with a call: the room, what you want changed and what you want to spend. Then Ryan comes out to the house, and you get a written scope after the visit.

Or call or text (609) 874-0990

Next project

Addition in New Hope, PA: a room under a glass roof with black steel windows on both sides, blue and white outdoor seating and a fieldstone fireplace

Glass-roof room with a stone fireplace.

Addition · New Hope, PA