Bucks County · Pennsylvania
Kitchen Remodeling in Yardley, PA
Yardley is a borough in Bucks County on the Delaware River, surrounded by Lower Makefield Township. This page is about kitchens: what the local offices review for kitchen work, what our kitchens cost, and how we run one. Design-build, by The Home X, in Princeton.
Local rules checked October 30, 2026
- Design-Build Remodeling
- A Crew We Manage
- General liability insurance (biBERK)
- 1-Year Written Warranty
- Written Change Orders
- NJ HIC #13VH13547600
- PA HIC #PA199109
Before work starts
What a kitchen in Yardley needs first
A kitchen remodel needs a building permit once it involves moving the sink, the range or a gas line, adding circuits for appliances, or taking out a wall. In Yardley, historic review can come first when the work shows outside: a new or bigger window over the sink, a range-hood duct through an outside wall, a door out to the yard, or a bump-out. Near the river, flood rules can change what a big remodel has to include.
Historic review: Yardley Borough
- Exterior work in the Historic District generally needs HARB review before construction: windows, doors, roofing, siding, porches, fences, additions and demolition. Source: Yardley: Is a permit needed?
Historic review: Lower Makefield Township
- The township’s local historic district is Edgewood Village. A COA is needed for any part of a structure visible from the public way. Source: Lower Makefield permit instructions (May 2023)
Flood zones
- A Floodplain Development Permit is required for construction, additions, elevating and significant improvements. Source: Yardley: Is a permit needed?
- Under the National Flood Insurance Program’s rules, work that costs 50% or more of a building’s market value counts as a “substantial improvement”, which brings the building under the current flood rules. A town can set a lower line, and where it does, the town’s number is the one that counts. Source: 44 CFR 59.1 (eCFR) · 44 CFR 60.1(d) (eCFR)
Permits: Yardley Borough
- Borough Hall is at 56 S. Main St. Building Code Official: 610-723-7719. Source: Yardley: Is a permit needed? · Yardley: Submit a permit
Permits: Lower Makefield Township
- Permits are submitted online. Residential permits take up to 15 business days. Source: Lower Makefield permit instructions (May 2023) · Lower Makefield permit portal
Every other Yardley rule, each with its source: remodeling in Yardley, PA. How long permits take in Pennsylvania, and what changes from town to town: remodel permits in NJ and PA. Rules change, so confirm with the office before you file.
Planning
Planning a kitchen in Yardley: what to decide first
The kitchen projects we show signed between $74,866.25 and $130,000.00.
- 01
Layout first
Whether the sink, range, gas line and walls stay put decides more of the price than any finish.
- 02
Appliances before cabinets
The cabinets are drawn around the appliance sizes, so pick them first.
- 03
Then cabinets, counters and light
Cabinets are usually the biggest line. Counters are cut to them, and lighting is easiest before the walls close.
The full checklist: Before you remodel a kitchen.
Next step
Price your project
The jobs we show, by room and town, are on Our Work, and the kitchen cost guide shows what moves the number. For yours: call (609) 874-0990 or send us your project, and you get a written scope after our visit.
FAQ
Kitchen remodeling in Yardley: questions
01Where do I get a permit for a kitchen remodel in Yardley?
Borough Hall is at 56 S. Main St. Building Code Official: 610-723-7719. On your job, any permit the work needs is in place before that work starts, and it’s written into your scope.
02Does historic review apply to a kitchen in Yardley?
If the work changes the outside of the house, such as a new or bigger window over the sink, a range-hood duct through an outside wall, a door out to the yard, or a bump-out, the historic review in Yardley Borough or Lower Makefield Township can apply first. Work inside the house is a matter for the building permit. Check whether your house is in a historic district before anything is ordered.
03My house in Yardley is in a flood zone. Does that change a kitchen remodel?
It can. A Floodplain Development Permit is required for construction, additions, elevating and significant improvements. Under the National Flood Insurance Program, work costing 50% or more of the building’s market value counts as a substantial improvement, which brings the building under the current flood rules. Ask the town’s floodplain office before you set the budget.
Keep reading

