Before you remodel a kitchen.

The decisions that set the price, in the order to make them. Get these right and the rest of the job goes the way it was drawn.

By Ryan McNee, owner · Updated November 3, 2026

Start here

What’s actually wrong with the kitchen you have?

Write down what bothers you before you look at a single photo. Not enough counter space next to the stove. Nowhere to put the mixer. Two people can’t pass each other. Dark corners. Cabinets that are falling apart. That list is what the new kitchen has to fix, and it keeps the project from turning into a list of things you saw online.

In order

The decisions, in the order to make them

  1. 01

    Layout

    Whether the sink, the range, the gas line and the walls stay where they are. Moving plumbing, gas or a wall costs more than anything you pick later, and taking out a wall that carries weight needs a beam and a permit.

  2. 02

    Budget

    Set it from real numbers, not a national average. The kitchen projects we show were signed between $74,866.25 and $130,000.00.

  3. 03

    Appliances

    Pick them before the cabinets are drawn. The cabinet layout is built around their sizes: range width, fridge depth and height, the dishwasher, and any panel-ready fronts.

  4. 04

    Cabinets

    A big line in the budget. Decide the construction level and the door style (see below) before the finishes.

  5. 05

    Counters and backsplash

    Chosen with the cabinets, because the slab, the edge and the sink style are measured and cut to them.

  6. 06

    Lighting and outlets

    Plan general light, light on the work surfaces and any accent light, plus outlets where you’ll really use them. It is far easier before the walls close.

Cabinets

Stock, semi-custom or custom cabinets

Stock

Made in set sizes and a short list of finishes. The lowest price and often the shortest wait, with fillers to close the gaps.

Semi-custom

Set boxes with more sizes, finishes, door styles and interior fittings to choose from.

Custom

Built to your room’s exact measurements, in any finish. The most choice and the highest price, and usually the longest wait.

Door style moves the price too

A flat slab or a simple shaker door costs less than a raised panel, and inset doors, which sit flush inside the frame, cost the most.

Counters

Countertops, briefly

  • Quartz is engineered stone: consistent color, no sealing, and resists stains. Keep hot pans off it.
  • Granite is natural stone, hard and heat-tolerant, every slab different. Most need sealing now and then.
  • Marble is beautiful and softer: lemon, vinegar and wine can etch the surface. People who love it accept the patina.
  • Quartzite is a natural stone that often looks like marble but is much harder. Check the slab, because some stones sold as quartzite are softer.

Choosing who builds it

How to check a contractor in NJ and PA

  • In New Jersey, home improvement contractors must register with the Division of Consumer Affairs. Ask for the number and look it up.
  • In Pennsylvania, contractors register with the Attorney General, and the number has to be on every contract. Pennsylvania also gives you three business days after signing to cancel without penalty, a contractor can’t take any payment before the contract is signed, and on a contract over $5,000 the deposit is capped at one-third of the price, plus any special-order materials named in the contract (73 P.S. § 517.9; PA Attorney General).
  • Ask for the insurance certificate, and check what it covers and its limits.
  • Get a written scope that lists what’s included, what isn’t, the materials, the allowances and the price. If two quotes differ a lot, they’re usually not pricing the same job: here’s how to line them up.
  • Ask how changes are handled. The answer you want: a written change order with the price, signed before the work starts. What else each state says the contract must include is in our contracts guide.
Ours: NJ HIC #13VH13547600 and PA HIC #PA199109, and general liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK), certificate available on request. See what we commit to on your job.

Next step

Get a number for your kitchen

Call (609) 874-0990 or send us the form. We talk about the project, your timeline and budget, then come see the house. You get a written scope after the visit, and you owe nothing until you sign. See the kitchen projects we show and their signed prices.

FAQ

Common questions

01What should I decide first when remodeling a kitchen?

The layout. Whether the sink, range and walls stay where they are decides more of the price than any finish you pick. After that: the budget, then cabinets, appliances, counters and lighting.

02Should I pick appliances before cabinets?

Yes. The cabinet layout is drawn around the appliance sizes: the width of the range, the fridge depth and height, the dishwasher, any panel-ready fronts. Choosing them late can mean redrawing the cabinets.

03What does a kitchen remodel cost near Princeton?

The kitchen projects we show were signed between $74,866.25 and $130,000.00. Your number comes in a written scope after we see the house.

04How do I check a contractor is registered?

In New Jersey, home improvement contractors register with the Division of Consumer Affairs, which can confirm a registration. In Pennsylvania, they register with the Attorney General, and the registration number has to be on every contract. Ours: NJ HIC #13VH13547600 and PA HIC #PA199109.