Skip to content
Kitchen in Lambertville, NJ: stained knotty wood cabinets with mission hardware, a cream island with a stone top and four wood stools, three copper pendants and an exposed brick column

Kitchen · Lambertville, NJ

Stained wood cabinets, copper pendants.

A Lambertville kitchen with stained knotty wood cabinets to the crown, a cream island with a farmhouse sink and seating for four, copper pendants and a painted green door.

See every photo
  • Design-Build Remodeling
  • A Crew We Manage
  • General liability insurance (biBERK)
  • 1-Year Written Warranty
  • Written Change Orders
  • NJ HIC #13VH13547600
  • PA HIC #PA199109

The room

What’s inthis kitchen.

Stained knotty wood cabinets, a cream painted island, gray and white stone counters, white subway tile, copper pendants, an exposed brick wall and a dark wood floor.

The island has a farmhouse sink facing the room and stools for four on the other side.

The cooktop is on the wall run under a stainless chimney hood, with spice pull-outs on both sides. A wine rack is built into the upper cabinets.

White farmhouse sink in a cream island with a stone top, copper pendants and windows around the eating area
Gas cooktop under a stainless chimney hood with white subway tile, stained wood cabinets to the crown and a built-in refrigerator
Room
Kitchen
Town
Lambertville, NJ
Layout
Island with seating for four
Sink
Farmhouse, in the island

This kitchen at our pricing today

$114,567.48

Figured from what the photos show, on the Signature tier of our instant estimate. It isn’t the price this client signed. Your price comes in a written scope after we see your house.

Price your kitchen →

The selections

What went into it,from the photos.

Each sample is cut from the finished photos, and the color under it is taken from the same spot.

  • Cabinets: Stained knotty wood, cut from the finished photo
    CabinetsStained knotty wood#A5583E in the photo
  • Island: Cream paint, cut from the finished photo
    IslandCream paint#BDAC9D in the photo
  • Counters: Gray and white stone, flowing veins, cut from the finished photo
    CountersGray and white stone, flowing veins#C1BCB9 in the photo
  • Pendants: Copper, cut from the finished photo
    PendantsCopper#A96855 in the photo
  • Backsplash: White subway tile, cut from the finished photo
    BacksplashWhite subway tile#C8BCB5 in the photo
  • Wall: Exposed brick, cut from the finished photo
    WallExposed brick#B48570 in the photo
  • Floor: Dark-stained wood, cut from the finished photo
    FloorDark-stained wood#38241B in the photo

The colors in this kitchen, as photographed

Mood boards

The finishes together,as built.

This kitchen as built: the photo, the samples cut from it and the colors measured from it.

Every sample on this board is cut from the finished photos, and each color chip is measured from the same photos. Tap the board to see it full size.

Up close

The details,one at a time.

White farmhouse sink in a cream island with a stone top, copper pendants and windows around the eating area

Farmhouse sink

A white farmhouse sink in the cream island, under the windows.

Two narrow stained wood pull-outs open on both sides of the cooktop, showing shallow shelves

Spice pull-outs

Pull-out spice racks on both sides of the cooktop.

Gas cooktop under a stainless chimney hood with white subway tile, stained wood cabinets to the crown and a built-in refrigerator

Cabinets to the crown

Stained wood cabinets up to the crown molding beside a chimney hood.

Long stone island top with a farmhouse sink, stained wood cabinets with a diamond wine rack, and a salvaged green painted door

Wine rack

A wine rack built into the upper cabinets.

How it works

Four steps,the same for every room.

Your price and scope are in writing before any work starts. The full process.

  1. 01

    Discovery call

    A call about the room and your budget, then a visit at the house. We measure, open what we can, and look at what the house is hiding: framing, plumbing, the electrical panel.

  2. 02

    Scope and design

    After the visit you get a written scope: what we do and don’t do, materials, allowances and the price. Layout and selections are settled on paper before anything comes out.

  3. 03

    Construction

    Any permit the work needs, in place before that work starts. A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. Any change is a written change order you sign before that work starts.

  4. 04

    Final walk-through

    We walk every room we touched with you and finish the punch list. Your 1-year workmanship warranty is in the contract, and manufacturer warranties pass through to you.

In writing

What we commit to,on every job.

The same words as our commitments page.

  1. Written scope after our visit

    After our visit, you get the scope in writing: what we’re doing, what we’re not, the materials and allowances, and the price. If it isn’t in the scope, it isn’t in the job, so nobody ends up arguing about what was “obviously included.”

  2. A crew we manage

    A crew we manage does the work; plumbing, electrical and HVAC work goes to subcontractors in those trades, and other specialty trades when a job needs them. We manage those subcontractors and stand behind their work. You deal with us, start to finish.

  3. General liability insurance

    General liability insurance with Berkshire Hathaway Direct Insurance Company (biBERK). Certificate available on request. We’re a registered home improvement contractor in New Jersey, NJ HIC #13VH13547600, and Pennsylvania, PA HIC #PA199109. On your job, any permit the work needs is in place before that work starts.

  4. 1-year workmanship warranty

    Your contract includes a 1-year workmanship warranty on our installation. Manufacturer warranties on fixtures, appliances and materials pass through to you on top of that. The full warranty terms, including what it doesn’t cover, come with your contract, before you sign.

  5. You hear it from us first

    Your contract has a schedule and we run the job against it. If something puts a date at risk, you hear it from us as soon as we know, not when you notice.

  6. Written change orders

    From the day you sign, nothing is added to your bill without your written approval. If you change something, or we open a wall and find a problem, you get a written change order with the price before that work starts.

Every photo

The finished kitchen,every angle.

Tap a photo to see it full size.

Yours next

Talk to Ryanabout your kitchen.

Start with a call: the room, what you want changed and what you want to spend. Then Ryan comes out to the house, and you get a written scope after the visit.

Or call or text (609) 874-0990

Next project

Kitchen in New Hope, PA: white Shaker cabinets down a long galley, a white peninsula, navy glazed tile, white oak floors and a navy glass-front china cabinet

White and navy galley kitchen.

Kitchen · New Hope, PA